How to Write an RFP for Interpretation Services in Canada
August 2026
Table of Contents
- What should an RFP for interpretation services include?
- Do you need an RFP?
- The Translation Bureau is optional for departments and agencies
- Standing offers, supply arrangements, and other routes
- Check which procurement framework governs the purchase
- How do trade agreement thresholds change what you have to do?
- Writing the scope of work
- Define the service demand
- Write interpreter working conditions into the requirement
- A copyable scope-of-work skeleton
- What evaluation criteria should you use?
- Sample mandatory criteria
- Sample rated criteria and weightings
- Structuring the pricing schedule
- Units suppliers must price
- Expenses and pre-approval
- Which clauses cause the most disputes?
- What the 2024 review found
- What the January 2026 review found
- What Canadian obligations apply on top?
- Official languages
- Accessibility
- Privacy and confidentiality
- Quebec requirements
- A realistic RFP timeline
- Common interpretation RFP mistakes
- Mistakes in the scope
- Mistakes in the contract terms
- From blank page to comparable bids
- Frequently asked questions
- Does a federal department have to use the Translation Bureau?
- What contract value forces a competitive process for interpretation services?
- How far in advance should an interpretation RFP be issued?
- Can one RFP cover interpretation and interpretation equipment?
- How long should suppliers get to respond to an interpretation RFP?
- What should you do if only one supplier bids?
An RFP for interpretation services should tell suppliers exactly what they are bidding on, how their proposals will be evaluated, how they will be paid, and which contract terms will govern the work after award. For a Canadian public-sector buyer, that also means checking the procurement rules that apply to your organization before the tender goes live.
A procurement officer with a posting date approaching needs more than a generic RFP template. Interpretation contracts create their own points of friction: minimum call-outs, cancellations, waiting time, task allocation, travel, interpreter working conditions, privacy, and the boundary between interpreting and the equipment that supports it.
Canada has recent evidence of what happens when those clauses are unclear. The Office of the Procurement Ombud reviewed 40 supplier complaints over federal interpretation contracts in 2024, with 37 complaints proceeding and being amalgamated because they raised identical issues. A further review published in January 2026 examined a separate complaint about how work was attributed under another interpretation contract.
This guide focuses on the tender document itself. It does not re-explain interpreting modes or equipment specifications; those belong in the service and equipment guidance linked throughout. The goal here is to move from a blank page to an RFP that returns bids you can compare and a contract your team can administer.
What should an RFP for interpretation services include?
At minimum, the RFP needs a clear scope of work, mandatory supplier requirements, rated evaluation criteria, a pricing schedule, and contract terms covering how work will be ordered and changed. It should also tell bidders what evidence they must submit, how accessibility and privacy will be handled, and who controls operational decisions once the contract begins.
A useful interpretation RFP usually contains the following sections:
- Background and purpose of the procurement, including who will use the service.
- Scope of work with language combinations, expected volumes, locations, hours, and service conditions.
- Mandatory criteria that determine whether a bid proceeds to scoring.
- Rated criteria with published weightings and a defined scoring method.
- Pricing schedule that forces every supplier to price the same units.
- Contract administration clauses covering bookings, cancellations, waiting time, travel, invoicing, and changes.
- Privacy, confidentiality, accessibility, security, and any jurisdiction-specific requirements.
- Submission instructions, procurement timetable, contract term, option periods, and the named contracting authority.
If you still need to decide which interpreting setup belongs in the scope, use the UNLS interpretation service overview before drafting the tender. For hardware and technician specifications, keep that detail in the equipment section and use the interpretation equipment rental guidance as the reference point.
Do you need an RFP?
The Translation Bureau is optional for departments and agencies
A federal department does not have to use the Translation Bureau for every interpretation requirement. The Bureau’s own mandate says that it became a special operating agency in 1995 and provides services to federal departments and agencies on an optional, cost-recovery basis.
That means a department can obtain services from the Bureau or procure from the private sector, subject to the procurement rules that apply to the requirement. The Translation Bureau mandate supports the optional, cost-recovery point for departments and agencies. Parliamentary interpretation has a separate statutory footing, so the same statement should not be extended to services for the Senate and House of Commons. For more on the Bureau itself, see Inside Canada’s Translation Bureau. UNLS also covers the wider federal context in How Government Interpreting Works in Canada and its government language services overview.
Standing offers, supply arrangements, and other routes
An RFP is only one procurement vehicle. Depending on your organization and the requirement, you may be working through a standing offer, supply arrangement, task authorization process, invitational competition, or another approved route. A municipality, school board, health authority, union, or NGO may also have its own procurement policy and approval thresholds.
Check which procurement framework governs the purchase
Before drafting, answer two questions internally: which procurement framework governs this purchase, and which services are genuinely in scope? If interpretation, equipment, captioning, and technicians will all be bought together, decide whether one supplier must provide the whole requirement or whether subcontracting and separate line items are permitted.
How do trade agreement thresholds change what you have to do?
For federal procurement, the trade-agreement thresholds in force from January 1, 2026 to December 31, 2027 are published in Treasury Board Contracting Policy Notice 2025-8. When a procurement is subject to a trade agreement, the applicable rules include publishing the tender notice through the Government Electronic Tendering Service on CanadaBuys.
The figures differ by entity type, and that difference matters when somebody copies a threshold from another tender.
| Agreement / category | Departments and agencies | Crown corporations / other government enterprises |
| CFTA services | $139,000 | $694,700 |
| CPTPP services | $239,200 | $653,200 |
| WTO-GPA services | $239,200 | $653,200 |
| CETA services | $239,200 | $653,200 Section A / $736,000 Section B |
| CFTA goods | $34,700 | $694,700 |
These are trade-agreement thresholds, rather than a universal rule that every purchase above one number must follow the same competitive process. Coverage depends on the entity, the agreement, the procurement category, and any applicable exceptions. Check your own procurement authority before deciding how the requirement must be competed.
The goods figure becomes relevant when interpretation equipment is bundled with the service. If hardware is a meaningful part of the requirement, classify and structure the procurement carefully rather than assuming the services threshold answers every question.
Writing the scope of work
The best scope lets two suppliers read the same document and price the same job. Vague language such as “interpretation as required” gives you bids built on different assumptions, which makes the evaluation harder before award and the invoices harder to challenge afterward.
Define the service demand
State the language combinations you expect and whether demand is predictable, seasonal, event-based, or called off as needed. Give bidders the best volume data you have, while making clear whether it is guaranteed or historical.
Include the service locations, expected hours, virtual requirements, notice periods, and any after-hours demand. If assignments may involve government hearings, union meetings, public consultations, or conferences, say so because the setting affects the interpreter profile and preparation required.
Where the RFP includes more than interpreting, separate the components. Captioning and transcription requirements can be linked to the relevant accessibility need, with technical detail kept in a dedicated schedule. UNLS’s service page for closed captioning and transcription can help buyers distinguish those deliverables from interpretation.
Write interpreter working conditions into the requirement
For simultaneous interpretation, sound quality is a working-condition issue as well as a technical one. In its April 2024 statement on interpretation services, the Translation Bureau described measures used to protect interpreters, including hearing-protection consoles and a technician assigned to each simultaneous meeting.
The same statement says virtual participants in simultaneous meetings must use ISO-compliant microphones and that interpreters may interrupt service when sound quality is insufficient or an acoustic incident occurs. A public-sector RFP can turn those operational lessons into clear requirements rather than leaving them to be negotiated on the day.
Keep detailed equipment specifications in a separate schedule and link them back to the service requirement. UNLS’s Canadian procurement requirements for interpretation equipment covers the hardware, compliance, insurance, and technician side without duplicating the tender-writing guidance here.
A copyable scope-of-work skeleton
| Scope item | What to specify |
| Requirement | Interpretation services required, business purpose, user groups, and contract period. |
| Languages | Expected language pairs or combinations, plus the process for requesting additional languages. |
| Demand | Historical volumes, estimated assignments, expected duration, and whether any quantity is guaranteed. |
| Locations and delivery | In-person sites, remote delivery conditions, travel expectations, and after-hours coverage. |
| Interpreter requirements | Required credentials, sector experience, clearances, confidentiality, and any mandatory training. |
| Booking process | Who can request work, required notice, confirmation process, and emergency booking route. |
| Working conditions | Audio requirements, technician responsibilities, interpreter safety provisions, breaks, and authority to stop unsafe work. |
| Related services | Equipment, technicians, captioning, or transcription, each separated into its own line item or schedule. |
| Reporting | Usage reports, incident reporting, invoice detail, service-level data, and contract-management meetings. |
What evaluation criteria should you use?
A requirement for “qualified interpreters” is difficult to score unless the RFP defines the qualification and asks bidders to show how their proposed resources meet it. Use mandatory criteria for requirements a bid must meet to proceed, then rated criteria to distinguish between suppliers that pass.
Ask bidders for evidence you can verify. A statement that a supplier has “qualified interpreters” tells an evaluator little unless the RFP defines the qualification and asks the bidder to show how its proposed resources meet it.
Sample mandatory criteria
| Mandatory criterion | Evidence to request |
| Legal capacity to contract | Business name, registration details, and authorized signatory. |
| Relevant interpretation experience | Required minimum experience described in the RFP, supported by comparable assignments. |
| Interpreter qualifications | Credential, accreditation, assessment, or experience requirements appropriate to the setting. |
| Privacy and confidentiality | Policies and contract commitments covering personal or protected information. |
| Capacity to meet service hours | Coverage model for normal hours and any after-hours requirement. |
| Insurance or security requirements | Certificates, clearances, or commitments where required by the buyer. |
| Accessibility requirements | Evidence that the supplier can provide the specified accommodations and accessible service delivery. |
Sample rated criteria and weightings
Adjust the weighting below to the risk and purpose of the contract, then publish the scoring method so bidders know what a strong response looks like.
| Rated criterion | Sample weighting | What a strong response demonstrates |
| Interpreter qualifications and relevant experience | 25% | Resources suited to the subject matter, languages, and settings in the scope. |
| Service delivery and assignment management | 20% | Clear booking, confirmation, substitution, escalation, and incident processes. |
| Capacity and continuity | 15% | Enough qualified resources to cover expected demand and absences. |
| Quality management and reporting | 10% | Defined review, complaint, corrective-action, and reporting process. |
| Price | 30% | Completed pricing schedule using the exact units requested. |
Provider evaluation continues after the RFP is drafted. UNLS’s guide to choosing a language services provider in Canada covers the response side: credentials, Canadian French, privacy, references, and the questions to ask when comparing suppliers.
Structuring the pricing schedule
Units suppliers must price
Pricing should be built around units the contract administrator can recognize on an invoice. If one bidder prices by the hour, another uses half-days, and a third assumes a two-hour minimum, the apparent low bid may disappear as soon as real assignments begin.
The RFP should state which units suppliers must price and how each one will be evaluated. A practical schedule may include:
- Hourly rate and any minimum billable period.
- Half-day or full-day rate where those units fit the work.
- Overtime, evening, weekend, or emergency premiums.
- Cancellation terms and the point at which a cancellation fee applies.
- Waiting time and other non-interpreting time, with the trigger defined.
- Travel time, mileage, airfare, accommodation, and per diem treatment where travel is possible.
- Equipment, technician, or remote-platform charges where they form part of the contract.
- Administrative or project-management charges, if permitted, stated as their own line item.
Expenses and pre-approval
A pricing schedule should also explain which expenses require pre-approval and what supporting documents the supplier must provide. The contract administrator should not have to infer after award whether a taxi, hotel night, or extra hour was authorized.
For realistic cost drivers and Canadian budgeting context, keep the detailed rates on the existing UNLS guide to budgeting for interpreting. The RFP’s job is to make suppliers price the same structure.
Which clauses cause the most disputes?
On June 11, 2024, suppliers working under federal interpretation contracts received a revised Annex A, Article 5.3 that changed how non-interpreting time was treated. Waiting time caused by delays or suspensions was brought into the definition, and suspensions had to be tracked to the minute. That is the kind of wording change that turns an abstract contract clause into a billing dispute.
| Clause | What can go wrong | How to draft it more clearly |
| Non-interpreting and waiting time | A later interpretation of the clause changes which hours are billable even though the underlying assignment has not changed. | Define waiting, delays, suspensions, breaks, and other non-interpreting periods. State which are billable and who records them. |
| Option period | The buyer exercises an option, then later amendment wording creates uncertainty about what was extended or changed. | State the notice method and deadline for exercising the option. Keep the option exercise separate from unrelated substantive amendments where possible. |
| Amendments | Suppliers receive revised terms with little review time or inconsistent explanations from different authorities. | Name the contracting authority, use one written channel, set a reasonable response period, and identify the exact clauses being changed. |
| Attribution of work | Assignments are distributed in a way that does not match the method written into the contract. | Spell out the allocation method, tie-break rules, exceptions, and records the buyer will retain. |
| Travel allotments | A travel assignment is issued without the allowance or expense treatment required by the contract. | List travel entitlements and approval steps in the task authorization or booking form. |
| Records | The buyer cannot reconstruct how an assignment or contract decision was administered. | Specify the records to retain for bookings, allocation decisions, approvals, amendments, and invoicing. |
What the 2024 review found
The 2024 Procurement Ombud review began with 40 supplier complaints received between June 25 and July 11, 2024. Three were withdrawn; the remaining 37 were amalgamated because they raised identical issues. The contracts had been awarded between September 21 and 25, 2023 under RFP EN960-231030/B for Parliamentary and Conference Interpretation Services, on an “as and when requested” basis through task authorizations. Their values ranged from $11,300 to $452,000 including taxes.
The amendment at issue was a revised Annex A, Article 5.3 sent on June 5 and June 11, 2024. It widened non-interpreting time to include waiting time caused by delays or suspensions and introduced minute-level tracking of suspensions. The option year itself had already been validly exercised by written notice on May 28, more than 30 calendar days before the June 30 expiry, and took legal effect on receipt. The Ombud found the later amendment process unreasonable, with review windows ranging from two to nine days and conflicting messages from the Contracting Authority and Project Authority. No bad faith was found.
What the January 2026 review found
The January 2026 Procurement Ombud review arose from a complaint filed on July 25, 2025. It found that work had not been attributed in strict compliance with the Attribution of the Work clause between February 1 and April 28, 2025. The Ombud also found a record-keeping breach of section 4.10.1 of the Directive on the Management of Procurement.
One Saskatoon task authorization also allowed one travel allotment for a trip exceeding five hours when the round trip required two. For a buyer drafting a new RFP, the lesson is concrete: allocation rules and travel entitlements need to be explicit, with enough records that a contract administrator can reproduce the decision later.
What Canadian obligations apply on top?
Federal buyers have official-language obligations before a tender is posted, while accessibility, privacy, and provincial rules can add requirements to the service itself. Which rules apply depends on the organization and jurisdiction.
Official languages
Federal institutions have obligations under the Official Languages Act for communications and services in English and French in the circumstances set out in the Act. CanadaBuys instructs buyers to ensure procurement notices and related tender documents are in both official languages before posting them on the Government Electronic Tendering Service. It states that the English and French content must be of equal quality and published simultaneously.
If the service will be delivered to the public on behalf of a federal institution, check whether the contract itself needs clauses that preserve the institution’s language obligations during delivery.
Accessibility
Section 5 of Ontario’s Integrated Accessibility Standards Regulation requires the Government of Ontario, the Legislative Assembly, and designated public-sector organizations to incorporate accessibility design, criteria, and features when procuring or acquiring goods, services, or facilities, except where it is not practicable to do so. See O. Reg. 191/11 for the governing provision.
At the federal level, the 2025 amendments to the Accessible Canada Regulations were registered on December 5, 2025 and published in Canada Gazette Part II on December 17. They incorporate CAN/ASC-EN 301 549 for specified digital technologies. The relevant requirements take effect on December 5, 2027 for federal public-sector entities, and on December 5, 2028 for private-sector entities and for public-sector mobile apps and non-web documents.
The scope also needs to account for Deaf and hard-of-hearing participants where the requirement calls for it. Sign-language interpretation, CART, and live captioning are separate deliverables that need their own language, staffing, platform, and pricing lines. UNLS covers ASL and LSQ interpreting for events and closed captioning and transcription in more detail.
A separate accessible-procurement standard, CAN-ASC-4.1, is still a draft voluntary standard as of August 2026, with publication expected in winter 2027. Do not write it into an RFP as though it were already a binding legal requirement.
Privacy and confidentiality
Where PIPEDA applies, an organization remains responsible for personal information transferred to a third party for processing and must use contractual or other means to provide a comparable level of protection. The PIPEDA accountability principle is a useful reason to put privacy obligations into the supplier contract rather than relying on a general confidentiality promise.
If a meeting creates a recording or transcript, or uses a remote platform that processes personal information, state what the supplier may collect, where it may be stored, how long it may be retained, and whether subcontractors or platform providers will have access.
Quebec requirements
A buyer operating in Quebec should check the Charter of the French Language and the rules that apply to its organization and procurement documents. UNLS covers the business-facing language requirements in its Bill 96 guide. Public-sector buyers may have additional rules that require legal or procurement review.
A realistic RFP timeline
Before suppliers see the tender, the team may already have spent days settling the scope, securing approvals, preparing bilingual documents where required, and checking privacy and accessibility. After posting come bidder questions, evaluation, award approvals, and supplier mobilization.
A working schedule might look like this:
| Stage | Typical internal owner | Planning allowance |
| Confirm need and procurement route | Program + procurement | Several working days |
| Draft scope, criteria, pricing schedule, and contract terms | Program + procurement | About one working week |
| Legal, accessibility, privacy, language, and approval review | Relevant internal teams | Several working days or longer |
| Tender posting and bidder question period | Procurement | Set by the applicable rules and complexity |
| Evaluation and clarifications | Evaluation team | Several working days to two weeks |
| Award, debrief readiness, and supplier onboarding | Procurement + program | Several working days |
| Mobilization before first assignment | Contract manager + supplier | Build in time for resource confirmation and systems setup |
For a modest procurement, six to eight weeks from the start of drafting to service commencement is a sensible internal planning assumption, not a period fixed anywhere in the rules. Complex federal procurements can take longer. The response period itself must follow the rules that apply to the procurement, so do not copy a timeline from an unrelated tender.
Common interpretation RFP mistakes
Mistakes in the scope
Before posting, check whether the scope gives bidders enough information to price the same requirement and whether the contract tells the eventual administrator what to do when the plan changes.
- Giving suppliers no usable volume data, then evaluating prices as though every bidder assumed the same workload.
- Using “qualified interpreter” without defining which credentials, assessments, clearances, or experience count.
- Combining mandatory and rated criteria so evaluators cannot tell whether a partial response fails or earns fewer points.
- Asking for one blended price that hides call-out minimums, travel, waiting time, cancellations, or technician charges.
Mistakes in the contract terms
- Leaving assignment allocation rules vague when more than one supplier or resource may be used.
- Making the project authority and contracting authority appear interchangeable when they have different powers.
- Adding substantive contract changes through an option-year notice instead of keeping the two decisions clearly separated.
- Copying accessibility language from another jurisdiction without checking whether it applies to your organization.
- Treating privacy as an NDA issue while ignoring recordings, remote platforms, subcontractors, and personal information processed by third parties.
- Writing detailed equipment specifications into the service evaluation when a separate equipment schedule would be easier to score and administer.
Event planners inside public bodies should also keep procurement separate from event design. UNLS’s multilingual conference guide covers audience, venue, interpretation, and event workflow questions that should be settled before the final tender goes out.
From blank page to comparable bids
A useful interpretation RFP makes the contract easier to run before anybody signs it. A supplier should be able to see what work is expected, how to price it, how the evaluation works, and what happens when an assignment changes.
For the buyer, the test is equally practical. Could somebody who did not write the RFP administer a cancellation, approve travel, record waiting time, or allocate an urgent assignment from the contract wording alone? If the answer is unclear, that clause needs more work before posting.
UN Language Services works with government organizations that need interpretation services in Canada, as well as unions and NGOs. If you are preparing a requirement and want to discuss what the interpreting side of the scope should cover, contact UNLS.
Frequently asked questions
Does a federal department have to use the Translation Bureau?
No. The Translation Bureau states that its services are optional for federal departments and agencies and are provided on a cost-recovery basis. Parliament is treated differently, so the same statement should not be extended to parliamentary services.
What contract value forces a competitive process for interpretation services?
There is no single Canada-wide value that forces every public buyer into the same process. For federal procurements subject to trade agreements, the 2026 to 2027 thresholds include $139,000 for CFTA services for departments and agencies, while several international agreements use $239,200. Crown corporation thresholds are higher. Your entity’s procurement rules, the applicable agreement, the procurement category, and any exceptions still need to be checked.
How far in advance should an interpretation RFP be issued?
Work backward from the first date on which interpretation will be needed and use the timeline table above to allow for drafting, approvals, the supplier response period, evaluation, award, and mobilization. The applicable procurement rules determine the minimum response period where one applies.
Can one RFP cover interpretation and interpretation equipment?
Yes, if the procurement route and scope allow it. Keep the service requirements separate from the equipment schedule and technician requirements so suppliers price the same components and evaluators can see what applies to each part of the delivery.
How long should suppliers get to respond to an interpretation RFP?
The response period depends on the procurement framework, trade agreements, complexity, and any minimum periods that apply. Give suppliers enough time to identify proposed interpreters, confirm availability, price travel or equipment, and prepare the evidence required by the evaluation criteria.
What should you do if only one supplier bids?
Follow the rules that govern your procurement and document the decision. Before moving ahead, check whether the requirement was overly restrictive, whether the posting reached the relevant market, and whether the single bid is compliant and represents an acceptable outcome under your organization’s procurement authority.
Author: Brian Bickford
Brian Bickford is the founder of UN Language Services, a leading provider of language solutions in Canada. With over two decades of experience in the industry, Brian has helped governments, unions, NGOs, and event planners overcome language barriers through expert interpretation, translation, and consulting. As a former freelancer turned entrepreneur, he remains committed to quality, client satisfaction, and empowering interpreters at every stage of their careers.